Categories | Hydraulic Casing Oscillator |
---|---|
Brand Name: | JYXC |
Model Number: | AFECZX120 |
Certification: | ISO9001 |
Place of Origin: | HeBei China |
MOQ: | 1 |
Price: | Negotiable |
Payment Terms: | Subject to the contract |
Supply Ability: | Subject to the contract |
Delivery Time: | 7-15 work days |
Packaging Details: | Wooden box+iron bracket fixation+plastic wrapping filmei or According to customer needs |
product name: | Casing Oscillator |
Max.casing diameter (mm): | 1200 |
Operating pressure(Bar): | 320 |
Torque(KN.m): | 2100 |
Lifting stroke(mm): | 500 |
Liting force (KN): | 2280 |
Clamping force (KN): | 1320 |
Rotation angle: | 24º |
Weight(T): | 15 T |
Outline dimension (mm): | 6485*2280*1690 |
Rotary arc Length(mm): | 260 |
after-sale service: | Subject to the contract |
Characteristics,Application range and Field ofthe AFE Series Casing Oscillators
Characteristics of the AFE Series casing Oscillators:
1. The design of trivalve clamp, the casing automatically has good performance to thecenter, and the holding force (embrace force) is large.
2.The mechanical and structural optimization desian is carried out by computer simulationunder construction conditions, which avoids the phenomenon of moving arc interferenceand hoisting in the working process
3. The motor and diesel pump station system configuration,
customers can chooseaccording to their own needs.
4. Manual and remote control operation mode, simple and convenient
to switch each other.
Application area:
Urban subway foundation,deep foundation pit retaining occlusal pile,urban renovationpull-out pile and remove obstacle pile, railway, port, road bridge, rivers, lakes, high-risebuildings, hydropower and water conservancy construction bored pile, special purposebored pile.
Applicable stratum :
All strata in the construction of the rotary driling rig. lt is especially suitable for complexstrata where mud such as pebble, silt, quicksand, silt, fragmentation and karst cavedevelopment, backfill, swamp, lake, River and so on can not normally protect walls.
Technical Data of the AFECZX Casing Oscillators:
Detail display of the Casting Oscillator:
Construction methods ( AFECZX Casing Oscillators+Crawler Crane ):
1.Connection the casing oscillator in the engineering crawler crane
and installationthe first casing.
2.The casing oscillator press the casing andgrab the soil in the
casing.
3.Connecting the next casing,grab the soilcontinuous.
4.Drilling into a predetermined deepthand installation the reinforcing cage.
5.Pouring concrete.
6.Pulling up the casing and movingthe casing oscillator.
Construction example:
![]() |