Categories | Welded Square Tube |
---|---|
Brand Name: | Sangang Technology |
Place of Origin: | Hebei China |
Price: | Negotiable |
Payment Terms: | T/T, L/C, D/A, D/P, Western Union |
Supply Ability: | 6000t\month |
Delivery Time: | 5-15work days |
Packaging Details: | According to customer needs |
Model Number: | SANGANG |
Certification: | SGS, CE |
MOQ: | 25T |
Product Name: | Galvanized Steel Pipe |
Standard: | GB/T3091-2001 , BS 1387-1985 , DIN EN10025 , EN10219 , JIS G3444:2004 , ASTM A53 SCH40/80/STD , BS- EN10255-2004 |
Steel Grade: | Q195/Q215/Q235/Q345/S235JR/GR.B-D/STK500 |
Surface Treatmen: | Galvanized |
Tolerance: | ±2% |
Application:: | building industry machinery/Construction of greenhouses..... |
size: | 10*20-50*100mm |
thickness: | 0.7-2.5mm |
Hot Dipped Pre-Galvanized Square Rectangular Pipe And Tube
Product Description:
Packaging & Shipping:
1) Minimum order quantity: 20 tons
2) Payment: 30% deposit in advance, the balance against the copy of
B/L; or 100% L/C, etc
3) Lead Time: within 10-25 workdays normally
4) Packing: Standard seaworthy packing or as per your request .(as
pictures)
5) Sample: Free sample is avaible.
6) Individual Service: can print your logo or brand name on steel
pipe/carbon steel pipe/ pe coated steel pipe.
1. Technology
Size (mm) | Wall Thickness(mm) | Size (mm) | Wall Thickness (mm) |
20x20 | 0.7-1.2 | 40x40 | 0.7-2.0 |
22x22 | 0.7-1.2 | 45x45 | 0.72.0 |
23x23 | 0.7-1.2 | 48x48 | 0.7-2.0 |
24x24 | 0.7-1.5 | 50x50 | 0.7-2.0 |
25x25 | 0.7-1.5 | 60x60 | 0.75-2.0 |
30x30 | 0.7-2.0 | 38x38 | 0.75-2.0 |
32x32 | 0.7-2.0 | 75x75 | 0.9-2.0 |
35x35 | 0.7-2.0 | 80x80 | 0.9-2.0 |
38x38 | 0.7-2.0 |
Picture
Packing :
FAQ:
1.Q: How about trade terms ?
A: FOB, CFR, CIF will be accepted
2.What are your major products?
A:We mainly dealing with Pipes,Pipe fittings, Ball Valves, Flange,
Timber Connector, Ground Screw, etc.
3.Q: Can you supply the threaded treatment pipe Fittings end ?
A: Yes, We can supply threaded and coupled end treatment.
4.Q:What is your MOQ ?
A:At least 8-10 tons for the unit dimension pipes and 1ton for
stock pipes
5.Q:How about the delivery time?
A: New production:Need about 15-40 days after receiving your down
payment or LC
Stock: After your down payment ,we will deliver within about 7days.
Contact
![]() |