Home >

Small Turgo Water Turbine Generator 55-200 Kw Rc Jet Turbine Engine

Categories Turgo Turbine Generator
Brand Name: Forster
Model Number: XJA-W-50/1*10
Certification: CE/TUV/ISO9001/From-E
Place of Origin: Sichuan, China (Mainland)
MOQ: 1 Piece/Pieces
Price: Negotiable
Payment Terms: L/C, T/T
Supply Ability: 50 Set/Sets per Month
Delivery Time: 120days
Packaging Details: wooden box
Designer head: 35-95 m
Traffic: 0.2-0.35 m3/s
Design speed: 600-1000 r/min
The power of generator: 55-200 kw
Driving mode: Straight league,Between the united
Keyword: Jet Turbine Engine For Sale
Certificate: ISO9001/CE/TUV/From-E
  • Product Details
  • Company Profile

Small Turgo Water Turbine Generator 55-200 Kw Rc Jet Turbine Engine

Small Turgo Water Turbine generator 55-200 Kw china rc Jet Turbine Engine For Sale


Our main products included:


1. Kaplan turbine generators series.


2. Turgo turbine generators series.


3. Tubular turbine generators series.


4. Francis turbine generators series.


5. Pelton turbine generators series.


Product features:


Turgo turbine hemispherical and airfoil blade runners are illustrated by the operation of the power station. The hemispherical rotor is relatively small compared to the airfoil runner, and the performance of the hemisphere runner is slightly lower than that of the airfoil runner.
The bearing is a device that supports the weight and axial thrust of the rotating part of the hydro-generator and the radial force when rotating. Microturbines typically have a thrust roller bearing and a single row radial ball bearing.
The casing is a bracket for the miniature hydro-generator set, and the casing is fixed to the machine pier.


Turgo turbine generator. It is mainly composed of a nozzle and a runner. The runner consists of an outer rim, an inner hub and a number of single bowl-shaped buckets fixed by the question. The nozzle jet ramps the blade on the front side of the wheel at an angle of 22.5° and then flows out from the back. The structure is simple, the cost is low, but the efficiency is low. Only for small power stations. Applicable head is 20~100 m.


1. Horizontal unit has the advantages of simple structure,convenient repair,reduce the plant height,advantages in reducing excavation depth.


2. The vertical unit with plant plane size small,a runner can be provided with a plurality of nozzles,(at most can be installed six nozzles),high specific speed,the same size as units of capacity is relatively small,light weight and so on.


Product features:
XJ02-W-40/1 x 11 Turgo turbine performance data and supporting table
ModelTurbine ParametersGenerator ParametersDriving modeSpeed WayWater Intake
Design head(m)Under the design headDesign speed (r/min)The power of generatorThe runaway speedRated speed(r/min)manuallyautomaticModeldianeter
Flow rate (m3/s)The output(kw)
XJ02-W-40/1 x 11350.20855.1592556001320Direct connectionmanuallyYTT-Z41 H-300
400.22367.6632556001320#####
450.23679.5371756001320#####
500.24993.4707757501650#####
550.261108.97411007501650#####
600.273124.57751007501650#####
650.284139.48061257501650#####
700.295154.68371257501650#####
750.305169.28661607501350#####
800.315185.989416010002200#####
850.32520692220010001800#####
900.334225.694920010001800#####
950.343246.597520010001800#####

Product pictuers:

Company Information

Our workshop

Advantages

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.


Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.


Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.


Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.


Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.


Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.


Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com


Quality Small Turgo Water Turbine Generator 55-200 Kw Rc Jet Turbine Engine for sale
Send your message to this supplier
 
*From:
*To: Chengdu Forster Technology Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
Contact Us Quickly